Dealing with construction permits: Time (days) (Time days) in Latvia

Latvia: Dealing with construction permits: Time was 192 days in 2019. ▼ Falling

Latest (2019)
192 days
Change on year
unchanged
World rank
43rd
of 188 countries
All-time high
220 days
in 2005
All-time low
176 days
in 2013
Years of data
15
2005–2019

Dealing with construction permits: Time in Latvia, 2005–2019

0501001502002005201220192005: 220 days2006: 220 days2007: 220 days2008: 219 days2009: 219 days2010: 218 days2011: 218 days2012: 218 days2013: 176 days2014: 176 days2015: 192 days2016: 192 days2017: 192 days2018: 192 days2019: 192 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Latvia is 192 days, measured in 2019.

Compared with earlier readings it is down 12.3% over ten years.

Over the whole period, dealing with construction permits: time in Latvia peaked at 220 days in 2005 and was at its lowest, 176 days, in 2013.

Latvia ranks 43rd of 188 countries on this measure, in the top quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Latvia, year by year

Annual values for Dealing with construction permits: Time (days) in Latvia, 2005 to 2019.
Year days Change
2005 220 days —
2006 220 days +0.0%
2007 220 days +0.0%
2008 219 days -0.5%
2009 219 days +0.0%
2010 218 days -0.5%
2011 218 days +0.0%
2012 218 days +0.0%
2013 176 days -19.3%
2014 176 days +0.0%
2015 192 days +9.1%
2016 192 days +0.0%
2017 192 days +0.0%
2018 192 days +0.0%
2019 192 days +0.0%

Latvia compared with similar countries

  • Latvia's 192 days is above the median for high income countries, which is 144.75 days, 1.3× the median. (62 countries reporting)
  • Latvia's 192 days is above the median for Europe & Central Asia, which is 156 days, 1.2× the median. (49 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 219.6 days 219 days 220 days 5
2010s 196.6 days 176 days 218 days 10

Countries ranked near Latvia

  1. 40 Chile 195 days compare
  2. 41 Madagascar 194 days compare
  3. 42 Hungary 192.5 days compare
  4. 44 Dominica 191 days compare
  5. 45 Italy 189.5 days compare
  6. 46 Zambia 188 days compare

See the full ranking of 188 places →

More private sector data for Latvia

All data for Latvia →

Frequently asked questions

What is dealing with construction permits: time in Latvia?
Dealing with construction permits: time in Latvia was 192 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Latvia?
The highest recorded value was 220 days in 2005.
What is the lowest dealing with construction permits: time recorded in Latvia?
The lowest recorded value was 176 days in 2013.
How does Latvia rank for dealing with construction permits: time?
Latvia ranks 43rd out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Latvia?
Over the last ten years it is down 12.3%. The long-run trend across the full record is falling.
Where does this Latvia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Latvia. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/latvia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/latvia/">Dealing with construction permits: Time in Latvia</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.