Lesotho vs Sierra Leone: Dealing with construction permits: Time

Lesotho
183 days
in 2019
Sierra Leone
182 days
in 2019
Lesotho rank
49th
Sierra Leone rank
50th

Dealing with construction permits: Time over time

  • Lesotho
  • Sierra Leone
0100200300400200520122019

How they compare

Lesotho currently reports 183 days against 182 days in Sierra Leone, a difference of 1 days.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Lesotho ahead.

Lesotho ranks 49th and Sierra Leone ranks 50th of 185 countries.

Lesotho has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Lesotho Sierra Leone Difference Ahead
2000s 375 days 213.2 days 161.8 days Lesotho
2010s 183 days 182.1 days 0.9 days Lesotho

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Lesotho or Sierra Leone?
Lesotho, at 183 days against 182 days in Sierra Leone as of 2019.
What is the difference in dealing with construction permits: time between Lesotho and Sierra Leone?
1 days, with Lesotho ahead.
How many years of comparable data are there for Lesotho and Sierra Leone?
15 years are reported by both, from 2005 to 2019.
How do Lesotho and Sierra Leone rank globally for dealing with construction permits: time?
Lesotho ranks 49th and Sierra Leone ranks 50th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.