Lesotho vs Tanzania: Dealing with construction permits: Time (days) (Time days)

Lesotho
183 days
in 2019
Tanzania
184 days
in 2019
Lesotho rank
51st
Tanzania rank
48th

Dealing with construction permits: Time (days) (Time days) over time

  • Lesotho
  • Tanzania
0100200300400200520122019

How they compare

Tanzania currently reports 184 days against 183 days in Lesotho, a difference of 1 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Lesotho ahead.

Lesotho ranks 51st and Tanzania ranks 48th of 188 countries.

Across the 2 decades both report, Lesotho averaged higher in 1 and Tanzania in 1.

Head to head by decade

Decade Lesotho Tanzania Difference Ahead
2000s 375 days 216 days 159 days Lesotho
2010s 183 days 214.1 days 31.1 days Tanzania

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Lesotho or Tanzania?
Tanzania, at 184 days against 183 days in Lesotho as of 2019.
What is the difference in dealing with construction permits: time between Lesotho and Tanzania?
1 days, with Tanzania ahead.
How many years of comparable data are there for Lesotho and Tanzania?
15 years are reported by both, from 2005 to 2019.
How do Lesotho and Tanzania rank globally for dealing with construction permits: time?
Lesotho ranks 51st and Tanzania ranks 48th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Lesotho vs Tanzania: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/lesotho/tanzania/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/lesotho/tanzania/">Lesotho vs Tanzania: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.