Lesotho vs Yemen: Dealing with construction permits: Time (days) (Time days)

Lesotho
183 days
in 2019
Yemen
184 days
in 2015
Lesotho rank
51st
Yemen rank
48th

Dealing with construction permits: Time (days) (Time days) over time

  • Lesotho
  • Yemen
100200300400200520122019

How they compare

Yemen currently reports 184 days against 183 days in Lesotho, a difference of 1 days.

The two have swapped places 1 time across 11 shared years of data; in 2005 it was Lesotho ahead.

Lesotho ranks 51st and Yemen ranks 48th of 188 countries.

Lesotho has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Lesotho Yemen Difference Ahead
2000s 375 days 109 days 266 days Lesotho
2010s 183 days 159 days 24 days Lesotho

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Lesotho or Yemen?
Yemen, at 184 days against 183 days in Lesotho as of 2015.
What is the difference in dealing with construction permits: time between Lesotho and Yemen?
1 days, with Yemen ahead.
How many years of comparable data are there for Lesotho and Yemen?
11 years are reported by both, from 2005 to 2015.
How do Lesotho and Yemen rank globally for dealing with construction permits: time?
Lesotho ranks 51st and Yemen ranks 48th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Lesotho vs Yemen: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/lesotho/yemen-rep/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/lesotho/yemen-rep/">Lesotho vs Yemen: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.