Lesotho vs Yemen: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Lesotho
- Yemen
How they compare
Yemen currently reports 184 days against 183 days in Lesotho, a difference of 1 days.
The two have swapped places 1 time across 11 shared years of data; in 2005 it was Lesotho ahead.
Lesotho ranks 49th and Yemen ranks 46th of 185 countries.
Lesotho has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Lesotho | Yemen | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 375 days | 109 days | 266 days | Lesotho |
| 2010s | 183 days | 159 days | 24 days | Lesotho |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Lesotho or Yemen?
- Yemen, at 184 days against 183 days in Lesotho as of 2015.
- What is the difference in dealing with construction permits: time between Lesotho and Yemen?
- 1 days, with Yemen ahead.
- How many years of comparable data are there for Lesotho and Yemen?
- 11 years are reported by both, from 2005 to 2015.
- How do Lesotho and Yemen rank globally for dealing with construction permits: time?
- Lesotho ranks 49th and Yemen ranks 46th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.