Liberia vs Qatar: Dealing with construction permits: Time (days) (Time days)

Liberia
87 days
in 2019
Qatar
87.5 days
in 2019
Liberia rank
161st
Qatar rank
160th

Dealing with construction permits: Time (days) (Time days) over time

  • Liberia
  • Qatar
050100150200620122019

How they compare

Qatar currently reports 87.5 days against 87 days in Liberia, a difference of 0.5 days.

The two have swapped places 1 time across 13 shared years of data; in 2007 it was Liberia ahead.

Liberia ranks 161st and Qatar ranks 160th of 188 countries.

Liberia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Liberia Qatar Difference Ahead
2000s 110.33 days 62 days 48.33 days Liberia
2010s 87 days 74.75 days 12.25 days Liberia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Liberia or Qatar?
Qatar, at 87.5 days against 87 days in Liberia as of 2019.
What is the difference in dealing with construction permits: time between Liberia and Qatar?
0.5 days, with Qatar ahead.
How many years of comparable data are there for Liberia and Qatar?
13 years are reported by both, from 2007 to 2019.
How do Liberia and Qatar rank globally for dealing with construction permits: time?
Liberia ranks 161st and Qatar ranks 160th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Liberia vs Qatar: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/liberia/qatar/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/liberia/qatar/">Liberia vs Qatar: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.