Dealing with construction permits: Time in Liberia
Liberia: Dealing with construction permits: Time was 87 days in 2019. ▼ Falling
Dealing with construction permits: Time in Liberia, 2006–2019
Source: World Bank. Measured in days.
Analysis
The most recent figure for dealing with construction permits: time in Liberia is 87 days, measured in 2019. That is the lowest value across all 14 years on record.
That represents a change of unchanged over ten years.
Over the whole period, dealing with construction permits: time in Liberia peaked at 153 days in 2006 and was at its lowest, 87 days, in 2009.
Liberia ranks 158th of 185 countries on this measure, in the bottom quarter.
The long-run direction has been consistently falling across the 14 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 121 days | 87 days | 153 days | 4 |
| 2010s | 87 days | 87 days | 87 days | 10 |
Countries ranked near Liberia
More private sector data for Liberia
- Merchandise trade 87.0% (2025)
- Food imports 23.1% (2023)
- Manufactures imports 42.8% (2023)
- Merchandise imports 2.49 billion current US$ (2025)
- Food exports 24.5% (2023)
- Manufactures exports 9.9% (2023)
- Merchandise exports 2.07 billion current US$ (2025)
- Commercial service exports 18.00 million current US$ (2024)
- Transport services 63.3% (2024)
- Computer, communications and other services 24.5% (2024)
Frequently asked questions
- What is dealing with construction permits: time in Liberia?
- Dealing with construction permits: time in Liberia was 87 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Liberia?
- The highest recorded value was 153 days in 2006.
- What is the lowest dealing with construction permits: time recorded in Liberia?
- The lowest recorded value was 87 days in 2009.
- How does Liberia rank for dealing with construction permits: time?
- Liberia ranks 158th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Liberia?
- Over the last ten years it is unchanged. The long-run trend across the full record is falling.
- Where does this Liberia data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 14 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.