Dealing with construction permits: Time in Liberia

Liberia: Dealing with construction permits: Time was 87 days in 2019. ▼ Falling

Latest (2019)
87 days
Change on year
unchanged
World rank
158th
of 185 countries
All-time high
153 days
in 2006
All-time low
87 days
in 2009
Years of data
14
2006–2019

Dealing with construction permits: Time in Liberia, 2006–2019

0501001502006201220192006: 153 days2007: 153 days2008: 91 days2009: 87 days2010: 87 days2011: 87 days2012: 87 days2013: 87 days2014: 87 days2015: 87 days2016: 87 days2017: 87 days2018: 87 days2019: 87 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Liberia is 87 days, measured in 2019. That is the lowest value across all 14 years on record.

That represents a change of unchanged over ten years.

Over the whole period, dealing with construction permits: time in Liberia peaked at 153 days in 2006 and was at its lowest, 87 days, in 2009.

Liberia ranks 158th of 185 countries on this measure, in the bottom quarter.

The long-run direction has been consistently falling across the 14 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 121 days 87 days 153 days 4
2010s 87 days 87 days 87 days 10

Countries ranked near Liberia

  1. 155 Benin 88 days compare
  2. 155 Myanmar 88 days compare
  3. 157 Qatar 87.5 days compare
  4. 158 Syria 87 days compare
  5. 160 Sri Lanka 86 days compare
  6. 160 United Kingdom 86 days compare

See the full ranking of 187 places →

More private sector data for Liberia

All data for Liberia →

Frequently asked questions

What is dealing with construction permits: time in Liberia?
Dealing with construction permits: time in Liberia was 87 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Liberia?
The highest recorded value was 153 days in 2006.
What is the lowest dealing with construction permits: time recorded in Liberia?
The lowest recorded value was 87 days in 2009.
How does Liberia rank for dealing with construction permits: time?
Liberia ranks 158th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Liberia?
Over the last ten years it is unchanged. The long-run trend across the full record is falling.
Where does this Liberia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 14 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.