Dealing with construction permits: Time (days) (Time days) in Qatar

Qatar: Dealing with construction permits: Time was 87.5 days in 2019. ▲ Rising

Latest (2019)
87.5 days
Change on year
unchanged
World rank
160th
of 188 countries
All-time high
87.5 days
in 2015
All-time low
62 days
in 2007
Years of data
13
2007–2019

Dealing with construction permits: Time in Qatar, 2007–2019

0204060802007201320192007: 62 days2008: 62 days2009: 62 days2010: 62 days2011: 62 days2012: 62 days2013: 62 days2014: 62 days2015: 87.5 days2016: 87.5 days2017: 87.5 days2018: 87.5 days2019: 87.5 days

Source: World Bank. Measured in days.

Analysis

Qatar recorded 87.5 days for dealing with construction permits: time in 2019. That is the highest value across all 13 years on record.

Compared with earlier readings it is up 41.1% over ten years.

Over the whole period, dealing with construction permits: time in Qatar peaked at 87.5 days in 2015 and was at its lowest, 62 days, in 2007.

Qatar ranks 160th of 188 countries on this measure, in the bottom quarter.

The long-run direction has been consistently rising across the 13 years of available data.

Dealing with construction permits: Time in Qatar, year by year

Annual values for Dealing with construction permits: Time (days) in Qatar, 2007 to 2019.
Year days Change
2007 62 days —
2008 62 days +0.0%
2009 62 days +0.0%
2010 62 days +0.0%
2011 62 days +0.0%
2012 62 days +0.0%
2013 62 days +0.0%
2014 62 days +0.0%
2015 87.5 days +41.1%
2016 87.5 days +0.0%
2017 87.5 days +0.0%
2018 87.5 days +0.0%
2019 87.5 days +0.0%

Qatar compared with similar countries

  • Qatar's 87.5 days is below the median for high income countries, which is 144.75 days, 60% of the median. (62 countries reporting)
  • Qatar's 87.5 days is below the median for Middle East, North Africa, Afghanistan & Pakistan, which is 127.5 days, 69% of the median. (22 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 62 days 62 days 62 days 3
2010s 74.75 days 62 days 87.5 days 10

Countries ranked near Qatar

  1. 157 Palau 90 days compare
  2. 158 Benin 88 days compare
  3. 158 Myanmar 88 days compare
  4. 161 Liberia 87 days compare
  5. 161 Syria 87 days compare
  6. 163 Sri Lanka 86 days compare
  7. 163 United Kingdom 86 days compare

See the full ranking of 188 places →

More private sector data for Qatar

All data for Qatar →

Frequently asked questions

What is dealing with construction permits: time in Qatar?
Dealing with construction permits: time in Qatar was 87.5 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Qatar?
The highest recorded value was 87.5 days in 2015.
What is the lowest dealing with construction permits: time recorded in Qatar?
The lowest recorded value was 62 days in 2007.
How does Qatar rank for dealing with construction permits: time?
Qatar ranks 160th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Qatar?
Over the last ten years it is up 41.1%. The long-run trend across the full record is rising.
Where does this Qatar data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 13 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Qatar. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/qatar/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/qatar/">Dealing with construction permits: Time in Qatar</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.