Liberia vs Syria: Dealing with construction permits: Time (days) (Time days)

Liberia
87 days
in 2019
Syria
87 days
in 2012
Liberia rank
161st
Syria rank
161st

Dealing with construction permits: Time (days) (Time days) over time

  • Liberia
  • Syria
050100150200520122019

How they compare

Liberia currently reports 87 days against 87 days in Syria, a difference of 0 days.

The two have swapped places 1 time across 7 shared years of data; in 2006 it was Liberia ahead.

Liberia ranks 161st and Syria ranks 161st of 188 countries.

Liberia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Liberia Syria Difference Ahead
2000s 121 days 87 days 34 days Liberia
2010s 87 days 87 days 0 days —

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Liberia or Syria?
Liberia, at 87 days against 87 days in Syria as of 2019.
What is the difference in dealing with construction permits: time between Liberia and Syria?
0 days, with Liberia ahead.
How many years of comparable data are there for Liberia and Syria?
7 years are reported by both, from 2006 to 2012.
How do Liberia and Syria rank globally for dealing with construction permits: time?
Liberia ranks 161st and Syria ranks 161st of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Liberia vs Syria: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/liberia/syrian-arab-republic/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/liberia/syrian-arab-republic/">Liberia vs Syria: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.