Liberia vs Syria: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Liberia
- Syria
How they compare
Liberia currently reports 87 days against 87 days in Syria, a difference of 0 days.
The two have swapped places 1 time across 7 shared years of data; in 2006 it was Liberia ahead.
Liberia ranks 158th and Syria ranks 158th of 185 countries.
Liberia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Liberia | Syria | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 121 days | 87 days | 34 days | Liberia |
| 2010s | 87 days | 87 days | 0 days | — |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Liberia or Syria?
- Liberia, at 87 days against 87 days in Syria as of 2019.
- What is the difference in dealing with construction permits: time between Liberia and Syria?
- 0 days, with Liberia ahead.
- How many years of comparable data are there for Liberia and Syria?
- 7 years are reported by both, from 2006 to 2012.
- How do Liberia and Syria rank globally for dealing with construction permits: time?
- Liberia ranks 158th and Syria ranks 158th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.