Dealing with construction permits: Time in Syria

Syria: Dealing with construction permits: Time was 87 days in 2012. ▬ Flat

Latest (2012)
87 days
Change on year
unchanged
World rank
158th
of 185 countries
All-time high
87 days
in 2005
All-time low
87 days
in 2005
Years of data
8
2005–2012

Dealing with construction permits: Time in Syria, 2005–2012

0204060802005200820122005: 87 days2006: 87 days2007: 87 days2008: 87 days2009: 87 days2010: 87 days2011: 87 days2012: 87 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Syria is 87 days, measured in 2012. That is the highest value across all 8 years on record.

Compared with earlier readings it is unchanged over ten years.

That places Syria 158th out of 185 countries with data for 2012, putting it in the bottom quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 87 days 87 days 87 days 5
2010s 87 days 87 days 87 days 3

Countries ranked near Syria

  1. 155 Benin 88 days compare
  2. 155 Myanmar 88 days
  3. 157 Qatar 87.5 days compare
  4. 158 Liberia 87 days compare
  5. 160 Sri Lanka 86 days compare
  6. 160 United Kingdom 86 days compare

See the full ranking of 187 places →

More private sector data for Syria

All data for Syria →

Frequently asked questions

What is dealing with construction permits: time in Syria?
Dealing with construction permits: time in Syria was 87 days in 2012, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Syria?
The highest recorded value was 87 days in 2005.
What is the lowest dealing with construction permits: time recorded in Syria?
The lowest recorded value was 87 days in 2005.
How does Syria rank for dealing with construction permits: time?
Syria ranks 158th out of 185 countries with data for 2012.
Is dealing with construction permits: time rising or falling in Syria?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Syria data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.