Dealing with construction permits: Time (days) (Time days) in Syria

Syria: Dealing with construction permits: Time was 87 days in 2012. ▬ Flat

Latest (2012)
87 days
Change on year
unchanged
World rank
161st
of 188 countries
All-time high
87 days
in 2005
All-time low
87 days
in 2005
Years of data
8
2005–2012

Dealing with construction permits: Time in Syria, 2005–2012

0204060802005200820122005: 87 days2006: 87 days2007: 87 days2008: 87 days2009: 87 days2010: 87 days2011: 87 days2012: 87 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Syria is 87 days, measured in 2012. That is the highest value across all 8 years on record.

Compared with earlier readings it is unchanged over ten years.

That places Syria 161st out of 188 countries with data for 2012, putting it in the bottom quarter.

Dealing with construction permits: Time in Syria, year by year

Annual values for Dealing with construction permits: Time (days) in Syria, 2005 to 2012.
Year days Change
2005 87 days —
2006 87 days +0.0%
2007 87 days +0.0%
2008 87 days +0.0%
2009 87 days +0.0%
2010 87 days +0.0%
2011 87 days +0.0%
2012 87 days +0.0%

Syria compared with similar countries

  • Syria's 87 days is below the median for low income countries, which is 133.5 days, 65% of the median. (22 countries reporting)
  • Syria's 87 days is below the median for Middle East, North Africa, Afghanistan & Pakistan, which is 127.5 days, 68% of the median. (22 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 87 days 87 days 87 days 5
2010s 87 days 87 days 87 days 3

Countries ranked near Syria

  1. 158 Benin 88 days compare
  2. 158 Myanmar 88 days
  3. 160 Qatar 87.5 days compare
  4. 161 Liberia 87 days compare
  5. 163 Sri Lanka 86 days compare
  6. 163 United Kingdom 86 days compare

See the full ranking of 188 places →

More private sector data for Syria

All data for Syria →

Frequently asked questions

What is dealing with construction permits: time in Syria?
Dealing with construction permits: time in Syria was 87 days in 2012, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Syria?
The highest recorded value was 87 days in 2005.
What is the lowest dealing with construction permits: time recorded in Syria?
The lowest recorded value was 87 days in 2005.
How does Syria rank for dealing with construction permits: time?
Syria ranks 161st out of 188 countries with data for 2012.
Is dealing with construction permits: time rising or falling in Syria?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Syria data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Syria. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/syrian-arab-republic/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/syrian-arab-republic/">Dealing with construction permits: Time in Syria</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.