Liberia vs United Kingdom: Dealing with construction permits: Time (days) (Time days)

Liberia
87 days
in 2019
United Kingdom
86 days
in 2019
Liberia rank
161st
United Kingdom rank
163rd

Dealing with construction permits: Time (days) (Time days) over time

  • Liberia
  • United Kingdom
050100150200520122019

How they compare

Liberia currently reports 87 days against 86 days in United Kingdom, a difference of 1 days.

The two have swapped places 2 times across 14 shared years of data; in 2006 it was Liberia ahead.

Liberia ranks 161st and United Kingdom ranks 163rd of 188 countries.

United Kingdom has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Liberia United Kingdom Difference Ahead
2000s 121 days 137.5 days 16.5 days United Kingdom
2010s 87 days 87.4 days 0.4 days United Kingdom

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Liberia or United Kingdom?
Liberia, at 87 days against 86 days in United Kingdom as of 2019.
What is the difference in dealing with construction permits: time between Liberia and United Kingdom?
1 days, with Liberia ahead.
How many years of comparable data are there for Liberia and United Kingdom?
14 years are reported by both, from 2006 to 2019.
How do Liberia and United Kingdom rank globally for dealing with construction permits: time?
Liberia ranks 161st and United Kingdom ranks 163rd of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Liberia vs United Kingdom: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/liberia/united-kingdom/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/liberia/united-kingdom/">Liberia vs United Kingdom: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.