Dealing with construction permits: Time (days) (Time days) in United Kingdom

United Kingdom: Dealing with construction permits: Time was 86 days in 2019. ▼ Falling

Latest (2019)
86 days
Change on year
unchanged
World rank
163rd
of 188 countries
All-time high
150 days
in 2005
All-time low
86 days
in 2011
Years of data
15
2005–2019

Dealing with construction permits: Time in United Kingdom, 2005–2019

0501001502005201220192005: 150 days2006: 150 days2007: 150 days2008: 150 days2009: 100 days2010: 100 days2011: 86 days2012: 86 days2013: 86 days2014: 86 days2015: 86 days2016: 86 days2017: 86 days2018: 86 days2019: 86 days

Source: World Bank. Measured in days.

Analysis

United Kingdom recorded 86 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

The figure is down 14.0% over ten years.

Over the whole period, dealing with construction permits: time in United Kingdom peaked at 150 days in 2005 and was at its lowest, 86 days, in 2011.

United Kingdom ranks 163rd of 188 countries on this measure, in the bottom quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in United Kingdom, year by year

Annual values for Dealing with construction permits: Time (days) in United Kingdom, 2005 to 2019.
Year days Change
2005 150 days —
2006 150 days +0.0%
2007 150 days +0.0%
2008 150 days +0.0%
2009 100 days -33.3%
2010 100 days +0.0%
2011 86 days -14.0%
2012 86 days +0.0%
2013 86 days +0.0%
2014 86 days +0.0%
2015 86 days +0.0%
2016 86 days +0.0%
2017 86 days +0.0%
2018 86 days +0.0%
2019 86 days +0.0%

United Kingdom compared with similar countries

  • United Kingdom's 86 days is below the median for high income countries, which is 144.75 days, 59% of the median. (62 countries reporting)
  • United Kingdom's 86 days is below the median for Europe & Central Asia, which is 156 days, 55% of the median. (49 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 140 days 100 days 150 days 5
2010s 87.4 days 86 days 100 days 10

Countries ranked near United Kingdom

  1. 160 Qatar 87.5 days compare
  2. 161 Liberia 87 days compare
  3. 161 Syria 87 days compare
  4. 163 Sri Lanka 86 days compare
  5. 165 Micronesia (country) 85 days compare
  6. 166 Iceland 84 days compare

See the full ranking of 188 places →

More private sector data for United Kingdom

All data for United Kingdom →

Frequently asked questions

What is dealing with construction permits: time in United Kingdom?
Dealing with construction permits: time in United Kingdom was 86 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in United Kingdom?
The highest recorded value was 150 days in 2005.
What is the lowest dealing with construction permits: time recorded in United Kingdom?
The lowest recorded value was 86 days in 2011.
How does United Kingdom rank for dealing with construction permits: time?
United Kingdom ranks 163rd out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in United Kingdom?
Over the last ten years it is down 14.0%. The long-run trend across the full record is falling.
Where does this United Kingdom data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in United Kingdom. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/united-kingdom/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/united-kingdom/">Dealing with construction permits: Time in United Kingdom</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.