Dealing with construction permits: Time in United Kingdom

United Kingdom: Dealing with construction permits: Time was 86 days in 2019. ▼ Falling

Latest (2019)
86 days
Change on year
unchanged
World rank
160th
of 185 countries
All-time high
150 days
in 2005
All-time low
86 days
in 2011
Years of data
15
2005–2019

Dealing with construction permits: Time in United Kingdom, 2005–2019

0501001502005201220192005: 150 days2006: 150 days2007: 150 days2008: 150 days2009: 100 days2010: 100 days2011: 86 days2012: 86 days2013: 86 days2014: 86 days2015: 86 days2016: 86 days2017: 86 days2018: 86 days2019: 86 days

Source: World Bank. Measured in days.

Analysis

United Kingdom recorded 86 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

The figure is down 14.0% over ten years.

Over the whole period, dealing with construction permits: time in United Kingdom peaked at 150 days in 2005 and was at its lowest, 86 days, in 2011.

United Kingdom ranks 160th of 185 countries on this measure, in the bottom quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 140 days 100 days 150 days 5
2010s 87.4 days 86 days 100 days 10

Countries ranked near United Kingdom

  1. 157 Qatar 87.5 days compare
  2. 158 Liberia 87 days compare
  3. 158 Syria 87 days compare
  4. 160 Sri Lanka 86 days compare
  5. 162 Micronesia (country) 85 days compare
  6. 163 Iceland 84 days compare

See the full ranking of 187 places →

More private sector data for United Kingdom

All data for United Kingdom →

Frequently asked questions

What is dealing with construction permits: time in United Kingdom?
Dealing with construction permits: time in United Kingdom was 86 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in United Kingdom?
The highest recorded value was 150 days in 2005.
What is the lowest dealing with construction permits: time recorded in United Kingdom?
The lowest recorded value was 86 days in 2011.
How does United Kingdom rank for dealing with construction permits: time?
United Kingdom ranks 160th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in United Kingdom?
Over the last ten years it is down 14.0%. The long-run trend across the full record is falling.
Where does this United Kingdom data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.