Lithuania vs Taiwan: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Lithuania
- Taiwan
How they compare
Taiwan currently reports 82 days against 74 days in Lithuania, a difference of 8 days.
That makes Taiwan's figure about 1.1 times Lithuania's.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Lithuania ahead.
Lithuania ranks 169th and Taiwan ranks 166th of 185 countries.
Lithuania has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Lithuania | Taiwan | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 161.1 days | 138 days | 23.1 days | Lithuania |
| 2010s | 108.2 days | 98.4 days | 9.8 days | Lithuania |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Lithuania or Taiwan?
- Taiwan, at 82 days against 74 days in Lithuania as of 2019.
- What is the difference in dealing with construction permits: time between Lithuania and Taiwan?
- 8 days, with Taiwan ahead.
- How many years of comparable data are there for Lithuania and Taiwan?
- 15 years are reported by both, from 2005 to 2019.
- How do Lithuania and Taiwan rank globally for dealing with construction permits: time?
- Lithuania ranks 169th and Taiwan ranks 166th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.