Lithuania vs Ukraine: Dealing with construction permits: Time (days) (Time days)

Lithuania
74 days
in 2019
Ukraine
72.5 days
in 2019
Lithuania rank
172nd
Ukraine rank
173rd

Dealing with construction permits: Time (days) (Time days) over time

  • Lithuania
  • Ukraine
100200300400500600200520122019

How they compare

Lithuania currently reports 74 days against 72.5 days in Ukraine, a difference of 1.5 days.

The two have swapped places 3 times across 15 shared years of data; in 2005 it was Ukraine ahead.

Lithuania ranks 172nd and Ukraine ranks 173rd of 188 countries.

Ukraine has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Lithuania Ukraine Difference Ahead
2000s 161.1 days 540.2 days 379.1 days Ukraine
2010s 108.2 days 176.75 days 68.55 days Ukraine

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Lithuania or Ukraine?
Lithuania, at 74 days against 72.5 days in Ukraine as of 2019.
What is the difference in dealing with construction permits: time between Lithuania and Ukraine?
1.5 days, with Lithuania ahead.
How many years of comparable data are there for Lithuania and Ukraine?
15 years are reported by both, from 2005 to 2019.
How do Lithuania and Ukraine rank globally for dealing with construction permits: time?
Lithuania ranks 172nd and Ukraine ranks 173rd of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Lithuania vs Ukraine: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/lithuania/ukraine/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/lithuania/ukraine/">Lithuania vs Ukraine: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.