Lithuania vs United States: Dealing with construction permits: Time (days) (Time days)

Lithuania
74 days
in 2019
United States
80.6 days
in 2019
Lithuania rank
172nd
United States rank
170th

Dealing with construction permits: Time (days) (Time days) over time

  • Lithuania
  • United States
050100150200520122019

How they compare

United States currently reports 80.6 days against 74 days in Lithuania, a difference of 6.6 days.

That makes United States's figure about 1.1 times Lithuania's.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Lithuania ahead.

Lithuania ranks 172nd and United States ranks 170th of 188 countries.

Lithuania has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Lithuania United States Difference Ahead
2000s 161.1 days 59 days 102.1 days Lithuania
2010s 108.2 days 83.12 days 25.08 days Lithuania

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Lithuania or United States?
United States, at 80.6 days against 74 days in Lithuania as of 2019.
What is the difference in dealing with construction permits: time between Lithuania and United States?
6.6 days, with United States ahead.
How many years of comparable data are there for Lithuania and United States?
15 years are reported by both, from 2005 to 2019.
How do Lithuania and United States rank globally for dealing with construction permits: time?
Lithuania ranks 172nd and United States ranks 170th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Lithuania vs United States: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/lithuania/united-states/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/lithuania/united-states/">Lithuania vs United States: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.