Malta vs Zimbabwe: Dealing with construction permits: Time (days) (Time days)

Malta
179 days
in 2019
Zimbabwe
178 days
in 2019
Malta rank
56th
Zimbabwe rank
57th

Dealing with construction permits: Time (days) (Time days) over time

  • Malta
  • Zimbabwe
200300400500600200520122019

How they compare

Malta currently reports 179 days against 178 days in Zimbabwe, a difference of 1 days.

The two have swapped places 1 time across 9 shared years of data; in 2011 it was Zimbabwe ahead.

Malta ranks 56th and Zimbabwe ranks 57th of 188 countries.

Zimbabwe has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: time, Malta or Zimbabwe?
Malta, at 179 days against 178 days in Zimbabwe as of 2019.
What is the difference in dealing with construction permits: time between Malta and Zimbabwe?
1 days, with Malta ahead.
How many years of comparable data are there for Malta and Zimbabwe?
9 years are reported by both, from 2011 to 2019.
How do Malta and Zimbabwe rank globally for dealing with construction permits: time?
Malta ranks 56th and Zimbabwe ranks 57th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Malta vs Zimbabwe: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/malta/zimbabwe/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/malta/zimbabwe/">Malta vs Zimbabwe: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.