Mauritania vs Panama: Dealing with construction permits: Time (days) (Time days)

Mauritania
104 days
in 2019
Panama
105 days
in 2019
Mauritania rank
136th
Panama rank
133rd

Dealing with construction permits: Time (days) (Time days) over time

  • Mauritania
  • Panama
050100150200520122019

How they compare

Panama currently reports 105 days against 104 days in Mauritania, a difference of 1 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Mauritania ahead.

Mauritania ranks 136th and Panama ranks 133rd of 188 countries.

Mauritania has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Mauritania Panama Difference Ahead
2000s 153 days 141.2 days 11.8 days Mauritania
2010s 108.9 days 107.8 days 1.1 days Mauritania

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Mauritania or Panama?
Panama, at 105 days against 104 days in Mauritania as of 2019.
What is the difference in dealing with construction permits: time between Mauritania and Panama?
1 days, with Panama ahead.
How many years of comparable data are there for Mauritania and Panama?
15 years are reported by both, from 2005 to 2019.
How do Mauritania and Panama rank globally for dealing with construction permits: time?
Mauritania ranks 136th and Panama ranks 133rd of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Mauritania vs Panama: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/mauritania/panama/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/mauritania/panama/">Mauritania vs Panama: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.