Mauritius vs Saint Vincent and the Grenadines: Dealing with construction permits: Time

Mauritius
95.5 days
in 2019
Saint Vincent and the Grenadines
92 days
in 2019
Mauritius rank
149th
Saint Vincent and the Grenadines rank
151st

Dealing with construction permits: Time over time

  • Mauritius
  • Saint Vincent and the Grenadines
100150200250300200520122019

How they compare

Mauritius currently reports 95.5 days against 92 days in Saint Vincent and the Grenadines, a difference of 3.5 days.

Across all 15 years both countries report, Mauritius has been ahead every year.

Mauritius ranks 149th and Saint Vincent and the Grenadines ranks 151st of 185 countries.

Mauritius has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Mauritius Saint Vincent and the Grenadines Difference Ahead
2000s 261.6 days 82 days 179.6 days Mauritius
2010s 184.15 days 89.9 days 94.25 days Mauritius

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Mauritius or Saint Vincent and the Grenadines?
Mauritius, at 95.5 days against 92 days in Saint Vincent and the Grenadines as of 2019.
What is the difference in dealing with construction permits: time between Mauritius and Saint Vincent and the Grenadines?
3.5 days, with Mauritius ahead.
How many years of comparable data are there for Mauritius and Saint Vincent and the Grenadines?
15 years are reported by both, from 2005 to 2019.
How do Mauritius and Saint Vincent and the Grenadines rank globally for dealing with construction permits: time?
Mauritius ranks 149th and Saint Vincent and the Grenadines ranks 151st of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.