Mexico vs Taiwan: Dealing with construction permits: Time (days) (Time days)

Mexico
82.12 days
in 2019
Taiwan
82 days
in 2019
Mexico rank
168th
Taiwan rank
169th

Dealing with construction permits: Time (days) (Time days) over time

  • Mexico
  • Taiwan
050100150200520122019

How they compare

Mexico currently reports 82.12 days against 82 days in Taiwan, a difference of 0.12 days.

The two have swapped places 4 times across 15 shared years of data; in 2005 it was Mexico ahead.

Mexico ranks 168th and Taiwan ranks 169th of 188 countries.

Mexico has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Mexico Taiwan Difference Ahead
2000s 163 days 138 days 25 days Mexico
2010s 99.51 days 98.4 days 1.11 days Mexico

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Mexico or Taiwan?
Mexico, at 82.12 days against 82 days in Taiwan as of 2019.
What is the difference in dealing with construction permits: time between Mexico and Taiwan?
0.12 days, with Mexico ahead.
How many years of comparable data are there for Mexico and Taiwan?
15 years are reported by both, from 2005 to 2019.
How do Mexico and Taiwan rank globally for dealing with construction permits: time?
Mexico ranks 168th and Taiwan ranks 169th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Mexico vs Taiwan: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/mexico/taiwan/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/mexico/taiwan/">Mexico vs Taiwan: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.