Mexico vs Tonga: Dealing with construction permits: Time (days) (Time days)

Mexico
82.12 days
in 2019
Tonga
77 days
in 2019
Mexico rank
168th
Tonga rank
171st

Dealing with construction permits: Time (days) (Time days) over time

  • Mexico
  • Tonga
050100150200520122019

How they compare

Mexico currently reports 82.12 days against 77 days in Tonga, a difference of 5.12 days.

That makes Mexico's figure about 1.1 times Tonga's.

Across all 15 years both countries report, Mexico has been ahead every year.

Mexico ranks 168th and Tonga ranks 171st of 188 countries.

Mexico has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Mexico Tonga Difference Ahead
2000s 163 days 67.4 days 95.6 days Mexico
2010s 99.51 days 68.2 days 31.31 days Mexico

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Mexico or Tonga?
Mexico, at 82.12 days against 77 days in Tonga as of 2019.
What is the difference in dealing with construction permits: time between Mexico and Tonga?
5.12 days, with Mexico ahead.
How many years of comparable data are there for Mexico and Tonga?
15 years are reported by both, from 2005 to 2019.
How do Mexico and Tonga rank globally for dealing with construction permits: time?
Mexico ranks 168th and Tonga ranks 171st of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Mexico vs Tonga: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/mexico/tonga/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/mexico/tonga/">Mexico vs Tonga: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.