Dealing with construction permits: Time in Tonga

Tonga: Dealing with construction permits: Time was 77 days in 2019. ▲ Rising

Latest (2019)
77 days
Change on year
unchanged
World rank
168th
of 185 countries
All-time high
77 days
in 2016
All-time low
62 days
in 2012
Years of data
15
2005–2019

Dealing with construction permits: Time in Tonga, 2005–2019

0204060802005201220192005: 68 days2006: 68 days2007: 75 days2008: 63 days2009: 63 days2010: 63 days2011: 63 days2012: 62 days2013: 62 days2014: 62 days2015: 62 days2016: 77 days2017: 77 days2018: 77 days2019: 77 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Tonga is 77 days, measured in 2019. That is the highest value across all 15 years on record.

The figure is up 22.2% over ten years.

Over the whole period, dealing with construction permits: time in Tonga peaked at 77 days in 2016 and was at its lowest, 62 days, in 2012.

That places Tonga 168th out of 185 countries with data for 2019, putting it in the bottom quarter.

The long-run direction has been consistently rising across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 67.4 days 63 days 75 days 5
2010s 68.2 days 62 days 77 days 10

Countries ranked near Tonga

  1. 165 Mexico 82.12 days compare
  2. 166 Taiwan 82 days compare
  3. 167 United States 80.6 days compare
  4. 169 Lithuania 74 days compare
  5. 170 Ukraine 72.5 days compare
  6. 171 Bahrain 71 days compare

See the full ranking of 187 places →

More private sector data for Tonga

All data for Tonga →

Frequently asked questions

What is dealing with construction permits: time in Tonga?
Dealing with construction permits: time in Tonga was 77 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Tonga?
The highest recorded value was 77 days in 2016.
What is the lowest dealing with construction permits: time recorded in Tonga?
The lowest recorded value was 62 days in 2012.
How does Tonga rank for dealing with construction permits: time?
Tonga ranks 168th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Tonga?
Over the last ten years it is up 22.2%. The long-run trend across the full record is rising.
Where does this Tonga data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.