Micronesia (country) vs United Kingdom: Dealing with construction permits: Time

Micronesia (country)
85 days
in 2019
United Kingdom
86 days
in 2019
Micronesia (country) rank
162nd
United Kingdom rank
160th

Dealing with construction permits: Time over time

  • Micronesia (country)
  • United Kingdom
050100150200520122019

How they compare

United Kingdom currently reports 86 days against 85 days in Micronesia (country), a difference of 1 days.

Across all 15 years both countries report, United Kingdom has been ahead every year.

Micronesia (country) ranks 162nd and United Kingdom ranks 160th of 185 countries.

United Kingdom has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Micronesia (country) United Kingdom Difference Ahead
2000s 85 days 140 days 55 days United Kingdom
2010s 85 days 87.4 days 2.4 days United Kingdom

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Micronesia (country) or United Kingdom?
United Kingdom, at 86 days against 85 days in Micronesia (country) as of 2019.
What is the difference in dealing with construction permits: time between Micronesia (country) and United Kingdom?
1 days, with United Kingdom ahead.
How many years of comparable data are there for Micronesia (country) and United Kingdom?
15 years are reported by both, from 2005 to 2019.
How do Micronesia (country) and United Kingdom rank globally for dealing with construction permits: time?
Micronesia (country) ranks 162nd and United Kingdom ranks 160th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.