Moldova vs Slovakia: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Moldova
- Slovakia
How they compare
Slovakia currently reports 300 days against 278 days in Moldova, a difference of 22 days.
That makes Slovakia's figure about 1.1 times Moldova's.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Moldova ahead.
Moldova ranks 10th and Slovakia ranks 9th of 185 countries.
Moldova has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Moldova | Slovakia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 341 days | 300 days | 41 days | Moldova |
| 2010s | 309.9 days | 300 days | 9.9 days | Moldova |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Moldova or Slovakia?
- Slovakia, at 300 days against 278 days in Moldova as of 2019.
- What is the difference in dealing with construction permits: time between Moldova and Slovakia?
- 22 days, with Slovakia ahead.
- How many years of comparable data are there for Moldova and Slovakia?
- 15 years are reported by both, from 2005 to 2019.
- How do Moldova and Slovakia rank globally for dealing with construction permits: time?
- Moldova ranks 10th and Slovakia ranks 9th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.