Morocco vs United Arab Emirates: Dealing with construction permits: Time

Morocco
58 days
in 2019
United Arab Emirates
47.5 days
in 2019
Morocco rank
179th
United Arab Emirates rank
181st

Dealing with construction permits: Time over time

  • Morocco
  • United Arab Emirates
0255075100125200520122019

How they compare

Morocco currently reports 58 days against 47.5 days in United Arab Emirates, a difference of 10.5 days.

That makes Morocco's figure about 1.2 times United Arab Emirates's.

Across all 15 years both countries report, Morocco has been ahead every year.

Morocco ranks 179th and United Arab Emirates ranks 181st of 185 countries.

Morocco has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Morocco United Arab Emirates Difference Ahead
2000s 109 days 76.1 days 32.9 days Morocco
2010s 64.2 days 48.25 days 15.95 days Morocco

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Morocco or United Arab Emirates?
Morocco, at 58 days against 47.5 days in United Arab Emirates as of 2019.
What is the difference in dealing with construction permits: time between Morocco and United Arab Emirates?
10.5 days, with Morocco ahead.
How many years of comparable data are there for Morocco and United Arab Emirates?
15 years are reported by both, from 2005 to 2019.
How do Morocco and United Arab Emirates rank globally for dealing with construction permits: time?
Morocco ranks 179th and United Arab Emirates ranks 181st of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.