Mozambique vs St. Lucia: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Mozambique
- St. Lucia
How they compare
Mozambique currently reports 118 days against 116 days in St. Lucia, a difference of 2 days.
Across all 15 years both countries report, Mozambique has been ahead every year.
Mozambique ranks 115th and St. Lucia ranks 118th of 185 countries.
Mozambique has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Mozambique | St. Lucia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 242 days | 135.8 days | 106.2 days | Mozambique |
| 2010s | 159 days | 116 days | 43 days | Mozambique |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Mozambique or St. Lucia?
- Mozambique, at 118 days against 116 days in St. Lucia as of 2019.
- What is the difference in dealing with construction permits: time between Mozambique and St. Lucia?
- 2 days, with Mozambique ahead.
- How many years of comparable data are there for Mozambique and St. Lucia?
- 15 years are reported by both, from 2005 to 2019.
- How do Mozambique and St. Lucia rank globally for dealing with construction permits: time?
- Mozambique ranks 115th and St. Lucia ranks 118th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.