Myanmar vs North Macedonia: Dealing with construction permits: Time (days) (Time days)

Myanmar
88 days
in 2019
North Macedonia
91 days
in 2019
Myanmar rank
158th
North Macedonia rank
156th

Dealing with construction permits: Time (days) (Time days) over time

  • Myanmar
  • North Macedonia
050100150200200520122019

How they compare

North Macedonia currently reports 91 days against 88 days in Myanmar, a difference of 3 days.

The two have swapped places 2 times across 8 shared years of data; in 2012 it was North Macedonia ahead.

Myanmar ranks 158th and North Macedonia ranks 156th of 188 countries.

North Macedonia has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: time, Myanmar or North Macedonia?
North Macedonia, at 91 days against 88 days in Myanmar as of 2019.
What is the difference in dealing with construction permits: time between Myanmar and North Macedonia?
3 days, with North Macedonia ahead.
How many years of comparable data are there for Myanmar and North Macedonia?
8 years are reported by both, from 2012 to 2019.
How do Myanmar and North Macedonia rank globally for dealing with construction permits: time?
Myanmar ranks 158th and North Macedonia ranks 156th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Myanmar vs North Macedonia: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/myanmar/north-macedonia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/myanmar/north-macedonia/">Myanmar vs North Macedonia: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.