Myanmar vs North Macedonia: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Myanmar
- North Macedonia
How they compare
North Macedonia currently reports 91 days against 88 days in Myanmar, a difference of 3 days.
The two have swapped places 2 times across 8 shared years of data; in 2012 it was North Macedonia ahead.
Myanmar ranks 155th and North Macedonia ranks 153rd of 185 countries.
North Macedonia has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: time, Myanmar or North Macedonia?
- North Macedonia, at 91 days against 88 days in Myanmar as of 2019.
- What is the difference in dealing with construction permits: time between Myanmar and North Macedonia?
- 3 days, with North Macedonia ahead.
- How many years of comparable data are there for Myanmar and North Macedonia?
- 8 years are reported by both, from 2012 to 2019.
- How do Myanmar and North Macedonia rank globally for dealing with construction permits: time?
- Myanmar ranks 155th and North Macedonia ranks 153rd of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.