Dealing with construction permits: Time in Myanmar
Myanmar: Dealing with construction permits: Time was 88 days in 2019. ▬ Flat
Dealing with construction permits: Time in Myanmar, 2012–2019
Source: World Bank. Measured in days.
Analysis
In 2019, dealing with construction permits: time in Myanmar stood at 88 days. That is the lowest value across all 8 years on record.
The figure is down 5.4% on the previous year and down 5.4% over ten years.
That places Myanmar 155th out of 185 countries with data for 2019, putting it in the bottom quarter.
Countries ranked near Myanmar
More private sector data for Myanmar
- Merchandise trade 36.3% (2025)
- Food imports 9.7% (2024)
- Manufactures imports 52.6% (2024)
- Merchandise imports 14.33 billion current US$ (2025)
- Food exports 36.7% (2024)
- Manufactures exports 35.7% (2024)
- Merchandise exports 15.30 billion current US$ (2025)
- Commercial service exports 6.46 billion current US$ (2019)
- Transport services 44.8% (2019)
- Computer, communications and other services 48.3% (2019)
Frequently asked questions
- What is dealing with construction permits: time in Myanmar?
- Dealing with construction permits: time in Myanmar was 88 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Myanmar?
- The highest recorded value was 93 days in 2012.
- What is the lowest dealing with construction permits: time recorded in Myanmar?
- The lowest recorded value was 88 days in 2019.
- How does Myanmar rank for dealing with construction permits: time?
- Myanmar ranks 155th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Myanmar?
- Over the last ten years it is down 5.4%. The long-run trend across the full record is flat.
- Where does this Myanmar data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.