Dealing with construction permits: Time in Myanmar

Myanmar: Dealing with construction permits: Time was 88 days in 2019. ▬ Flat

Latest (2019)
88 days
Change on year
down 5.4%
World rank
155th
of 185 countries
All-time high
93 days
in 2012
All-time low
88 days
in 2019
Years of data
8
2012–2019

Dealing with construction permits: Time in Myanmar, 2012–2019

0204060801002012201520192012: 93 days2013: 93 days2014: 93 days2015: 93 days2016: 93 days2017: 93 days2018: 93 days2019: 88 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Myanmar stood at 88 days. That is the lowest value across all 8 years on record.

The figure is down 5.4% on the previous year and down 5.4% over ten years.

That places Myanmar 155th out of 185 countries with data for 2019, putting it in the bottom quarter.

Countries ranked near Myanmar

  1. 153 North Macedonia 91 days compare
  2. 154 Palau 90 days compare
  3. 155 Benin 88 days compare
  4. 157 Qatar 87.5 days compare
  5. 158 Liberia 87 days compare
  6. 158 Syrian Arab Republic 87 days

See the full ranking of 187 places →

More private sector data for Myanmar

All data for Myanmar →

Frequently asked questions

What is dealing with construction permits: time in Myanmar?
Dealing with construction permits: time in Myanmar was 88 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Myanmar?
The highest recorded value was 93 days in 2012.
What is the lowest dealing with construction permits: time recorded in Myanmar?
The lowest recorded value was 88 days in 2019.
How does Myanmar rank for dealing with construction permits: time?
Myanmar ranks 155th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Myanmar?
Over the last ten years it is down 5.4%. The long-run trend across the full record is flat.
Where does this Myanmar data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.