Dealing with construction permits: Time (days) (Time days) in Myanmar

Myanmar: Dealing with construction permits: Time was 88 days in 2019. ▬ Flat

Latest (2019)
88 days
Change on year
down 5.4%
World rank
158th
of 188 countries
All-time high
93 days
in 2012
All-time low
88 days
in 2019
Years of data
8
2012–2019

Dealing with construction permits: Time in Myanmar, 2012–2019

0204060801002012201520192012: 93 days2013: 93 days2014: 93 days2015: 93 days2016: 93 days2017: 93 days2018: 93 days2019: 88 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Myanmar stood at 88 days. That is the lowest value across all 8 years on record.

The figure is down 5.4% on the previous year and down 5.4% over ten years.

That places Myanmar 158th out of 188 countries with data for 2019, putting it in the bottom quarter.

Dealing with construction permits: Time in Myanmar, year by year

Annual values for Dealing with construction permits: Time (days) in Myanmar, 2012 to 2019.
Year days Change
2012 93 days —
2013 93 days +0.0%
2014 93 days +0.0%
2015 93 days +0.0%
2016 93 days +0.0%
2017 93 days +0.0%
2018 93 days +0.0%
2019 88 days -5.4%

Myanmar compared with similar countries

  • Myanmar's 88 days is below the median for lower middle income countries, which is 159 days, 55% of the median. (47 countries reporting)
  • Myanmar's 88 days is below the median for East Asia & Pacific, which is 103.67 days, 85% of the median. (28 countries reporting)

Countries ranked near Myanmar

  1. 156 North Macedonia 91 days compare
  2. 157 Palau 90 days compare
  3. 158 Benin 88 days compare
  4. 160 Qatar 87.5 days compare
  5. 161 Liberia 87 days compare
  6. 161 Syria 87 days

See the full ranking of 188 places →

More private sector data for Myanmar

All data for Myanmar →

Frequently asked questions

What is dealing with construction permits: time in Myanmar?
Dealing with construction permits: time in Myanmar was 88 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Myanmar?
The highest recorded value was 93 days in 2012.
What is the lowest dealing with construction permits: time recorded in Myanmar?
The lowest recorded value was 88 days in 2019.
How does Myanmar rank for dealing with construction permits: time?
Myanmar ranks 158th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Myanmar?
Over the last ten years it is down 5.4%. The long-run trend across the full record is flat.
Where does this Myanmar data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Myanmar. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/myanmar/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/myanmar/">Dealing with construction permits: Time in Myanmar</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.