Dealing with construction permits: Time in North Macedonia

North Macedonia: Dealing with construction permits: Time was 91 days in 2019. ▼ Falling

Latest (2019)
91 days
Change on year
unchanged
World rank
153rd
of 185 countries
All-time high
183 days
in 2005
All-time low
91 days
in 2013
Years of data
15
2005–2019

Dealing with construction permits: Time in North Macedonia, 2005–2019

0501001502002005201220192005: 183 days2006: 183 days2007: 183 days2008: 183 days2009: 131 days2010: 131 days2011: 105 days2012: 106 days2013: 91 days2014: 91 days2015: 91 days2016: 91 days2017: 91 days2018: 91 days2019: 91 days

Source: World Bank. Measured in days.

Analysis

North Macedonia recorded 91 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

The figure is down 30.5% over ten years.

Over the whole period, dealing with construction permits: time in North Macedonia peaked at 183 days in 2005 and was at its lowest, 91 days, in 2013.

North Macedonia ranks 153rd of 185 countries on this measure, in the bottom quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 172.6 days 131 days 183 days 5
2010s 97.9 days 91 days 131 days 10

Countries ranked near North Macedonia

  1. 150 New Zealand 93 days compare
  2. 151 Lao PDR 92 days compare
  3. 151 St. Vincent and the Grenadines 92 days compare
  4. 154 Palau 90 days compare
  5. 155 Benin 88 days compare
  6. 155 Myanmar 88 days compare

See the full ranking of 187 places →

More private sector data for North Macedonia

All data for North Macedonia →

Frequently asked questions

What is dealing with construction permits: time in North Macedonia?
Dealing with construction permits: time in North Macedonia was 91 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in North Macedonia?
The highest recorded value was 183 days in 2005.
What is the lowest dealing with construction permits: time recorded in North Macedonia?
The lowest recorded value was 91 days in 2013.
How does North Macedonia rank for dealing with construction permits: time?
North Macedonia ranks 153rd out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in North Macedonia?
Over the last ten years it is down 30.5%. The long-run trend across the full record is falling.
Where does this North Macedonia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.