Namibia vs Netherlands: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Namibia
- Netherlands
How they compare
Netherlands currently reports 161 days against 160 days in Namibia, a difference of 1 days.
Across all 15 years both countries report, Netherlands has been ahead every year.
Namibia ranks 70th and Netherlands ranks 69th of 185 countries.
Netherlands has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Namibia | Netherlands | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 145 days | 179.5 days | 34.5 days | Netherlands |
| 2010s | 152.5 days | 164.7 days | 12.2 days | Netherlands |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Namibia or Netherlands?
- Netherlands, at 161 days against 160 days in Namibia as of 2019.
- What is the difference in dealing with construction permits: time between Namibia and Netherlands?
- 1 days, with Netherlands ahead.
- How many years of comparable data are there for Namibia and Netherlands?
- 15 years are reported by both, from 2005 to 2019.
- How do Namibia and Netherlands rank globally for dealing with construction permits: time?
- Namibia ranks 70th and Netherlands ranks 69th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.