New Zealand vs Saint Vincent and the Grenadines: Dealing with construction permits: Time

New Zealand
93 days
in 2019
Saint Vincent and the Grenadines
92 days
in 2019
New Zealand rank
153rd
Saint Vincent and the Grenadines rank
154th

Dealing with construction permits: Time over time

  • New Zealand
  • Saint Vincent and the Grenadines
020406080100200520122019

How they compare

New Zealand currently reports 93 days against 92 days in Saint Vincent and the Grenadines, a difference of 1 days.

Across all 15 years both countries report, New Zealand has been ahead every year.

New Zealand ranks 153rd and Saint Vincent and the Grenadines ranks 154th of 188 countries.

New Zealand has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade New Zealand Saint Vincent and the Grenadines Difference Ahead
2000s 93 days 82 days 11 days New Zealand
2010s 93 days 89.9 days 3.1 days New Zealand

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, New Zealand or Saint Vincent and the Grenadines?
New Zealand, at 93 days against 92 days in Saint Vincent and the Grenadines as of 2019.
What is the difference in dealing with construction permits: time between New Zealand and Saint Vincent and the Grenadines?
1 days, with New Zealand ahead.
How many years of comparable data are there for New Zealand and Saint Vincent and the Grenadines?
15 years are reported by both, from 2005 to 2019.
How do New Zealand and Saint Vincent and the Grenadines rank globally for dealing with construction permits: time?
New Zealand ranks 153rd and Saint Vincent and the Grenadines ranks 154th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

New Zealand vs Saint Vincent and the Grenadines: Dealing with construction permits: Time. Statizoid. Retrieved 29 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/new-zealand/st-vincent-and-the-grenadines/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/new-zealand/st-vincent-and-the-grenadines/">New Zealand vs Saint Vincent and the Grenadines: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.