Niger vs Serbia: Dealing with construction permits: Time

Niger
98 days
in 2019
Serbia
99.5 days
in 2019
Niger rank
145th
Serbia rank
142nd

Dealing with construction permits: Time over time

  • Niger
  • Serbia
100150200250300350200520122019

How they compare

Serbia currently reports 99.5 days against 98 days in Niger, a difference of 1.5 days.

The two have swapped places 3 times across 15 shared years of data; in 2005 it was Niger ahead.

Niger ranks 145th and Serbia ranks 142nd of 185 countries.

Across the 2 decades both report, Niger averaged higher in 1 and Serbia in 1.

Head to head by decade

Decade Niger Serbia Difference Ahead
2000s 317 days 294.2 days 22.8 days Niger
2010s 163.9 days 238.85 days 74.95 days Serbia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Niger or Serbia?
Serbia, at 99.5 days against 98 days in Niger as of 2019.
What is the difference in dealing with construction permits: time between Niger and Serbia?
1.5 days, with Serbia ahead.
How many years of comparable data are there for Niger and Serbia?
15 years are reported by both, from 2005 to 2019.
How do Niger and Serbia rank globally for dealing with construction permits: time?
Niger ranks 145th and Serbia ranks 142nd of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.