Dealing with construction permits: Time (days) (Time days) in Serbia

Serbia: Dealing with construction permits: Time was 99.5 days in 2019. ▼ Falling

Latest (2019)
99.5 days
Change on year
down 6.1%
World rank
145th
of 188 countries
All-time high
339 days
in 2008
All-time low
99.5 days
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Time in Serbia, 2005–2019

1001502002503003502005201220192005: 265 days2006: 264 days2007: 264 days2008: 339 days2009: 339 days2010: 339 days2011: 339 days2012: 323 days2013: 323 days2014: 319 days2015: 328 days2016: 106 days2017: 106 days2018: 106 days2019: 99.5 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Serbia stood at 99.5 days. That is the lowest value across all 15 years on record.

That represents a change of down 6.1% on the previous year and down 70.6% over ten years.

Over the whole period, dealing with construction permits: time in Serbia peaked at 339 days in 2008 and was at its lowest, 99.5 days, in 2019.

Serbia ranks 145th of 188 countries on this measure, in the bottom quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Serbia, year by year

Annual values for Dealing with construction permits: Time (days) in Serbia, 2005 to 2019.
Year days Change
2005 265 days —
2006 264 days -0.4%
2007 264 days +0.0%
2008 339 days +28.4%
2009 339 days +0.0%
2010 339 days +0.0%
2011 339 days +0.0%
2012 323 days -4.7%
2013 323 days +0.0%
2014 319 days -1.2%
2015 328 days +2.8%
2016 106 days -67.7%
2017 106 days +0.0%
2018 106 days +0.0%
2019 99.5 days -6.1%

Serbia compared with similar countries

  • Serbia's 99.5 days is below the median for upper middle income countries, which is 131 days, 76% of the median. (55 countries reporting)
  • Serbia's 99.5 days is below the median for Europe & Central Asia, which is 156 days, 64% of the median. (49 countries reporting)

Biggest year-on-year movements

Years where Dealing with construction permits: Time in Serbia changed far more than this series normally does. A large move can be a real event or a change in how the figure was measured — the source note below says who published it.

YearChange FromTo
2016 -67.7% 328 days 106 days
2008 +28.4% 264 days 339 days

Averages by decade

DecadeAverage LowestHighest Years
2000s 294.2 days 264 days 339 days 5
2010s 238.85 days 99.5 days 339 days 10

Countries ranked near Serbia

  1. 142 Cape Verde 101 days compare
  2. 143 Saudi Arabia 100 days compare
  3. 143 Turkey 100 days compare
  4. 146 Armenia 99 days compare
  5. 146 Solomon Islands 99 days compare
  6. 148 Niger 98 days compare

See the full ranking of 188 places →

More private sector data for Serbia

All data for Serbia →

Frequently asked questions

What is dealing with construction permits: time in Serbia?
Dealing with construction permits: time in Serbia was 99.5 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Serbia?
The highest recorded value was 339 days in 2008.
What is the lowest dealing with construction permits: time recorded in Serbia?
The lowest recorded value was 99.5 days in 2019.
How does Serbia rank for dealing with construction permits: time?
Serbia ranks 145th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Serbia?
Over the last ten years it is down 70.6%. The long-run trend across the full record is falling.
Where does this Serbia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Serbia. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/serbia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/serbia/">Dealing with construction permits: Time in Serbia</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.