Dealing with construction permits: Time in Serbia

Serbia: Dealing with construction permits: Time was 99.5 days in 2019. ▼ Falling

Latest (2019)
99.5 days
Change on year
down 6.1%
World rank
142nd
of 185 countries
All-time high
339 days
in 2008
All-time low
99.5 days
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Time in Serbia, 2005–2019

1001502002503003502005201220192005: 265 days2006: 264 days2007: 264 days2008: 339 days2009: 339 days2010: 339 days2011: 339 days2012: 323 days2013: 323 days2014: 319 days2015: 328 days2016: 106 days2017: 106 days2018: 106 days2019: 99.5 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Serbia stood at 99.5 days. That is the lowest value across all 15 years on record.

That represents a change of down 6.1% on the previous year and down 70.6% over ten years.

Over the whole period, dealing with construction permits: time in Serbia peaked at 339 days in 2008 and was at its lowest, 99.5 days, in 2019.

Serbia ranks 142nd of 185 countries on this measure, in the bottom quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 294.2 days 264 days 339 days 5
2010s 238.85 days 99.5 days 339 days 10

Countries ranked near Serbia

  1. 139 Cape Verde 101 days compare
  2. 140 Saudi Arabia 100 days compare
  3. 140 Turkey 100 days compare
  4. 143 Armenia 99 days compare
  5. 143 Solomon Islands 99 days compare
  6. 145 Niger 98 days compare

See the full ranking of 187 places →

More private sector data for Serbia

All data for Serbia →

Frequently asked questions

What is dealing with construction permits: time in Serbia?
Dealing with construction permits: time in Serbia was 99.5 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Serbia?
The highest recorded value was 339 days in 2008.
What is the lowest dealing with construction permits: time recorded in Serbia?
The lowest recorded value was 99.5 days in 2019.
How does Serbia rank for dealing with construction permits: time?
Serbia ranks 142nd out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Serbia?
Over the last ten years it is down 70.6%. The long-run trend across the full record is falling.
Where does this Serbia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.