North Macedonia vs Palau: Dealing with construction permits: Time

North Macedonia
91 days
in 2019
Palau
90 days
in 2019
North Macedonia rank
153rd
Palau rank
154th

Dealing with construction permits: Time over time

  • North Macedonia
  • Palau
050100150200200520122019

How they compare

North Macedonia currently reports 91 days against 90 days in Palau, a difference of 1 days.

Across all 15 years both countries report, North Macedonia has been ahead every year.

North Macedonia ranks 153rd and Palau ranks 154th of 185 countries.

North Macedonia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade North Macedonia Palau Difference Ahead
2000s 172.6 days 90 days 82.6 days North Macedonia
2010s 97.9 days 90 days 7.9 days North Macedonia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, North Macedonia or Palau?
North Macedonia, at 91 days against 90 days in Palau as of 2019.
What is the difference in dealing with construction permits: time between North Macedonia and Palau?
1 days, with North Macedonia ahead.
How many years of comparable data are there for North Macedonia and Palau?
15 years are reported by both, from 2005 to 2019.
How do North Macedonia and Palau rank globally for dealing with construction permits: time?
North Macedonia ranks 153rd and Palau ranks 154th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.