Dealing with construction permits: Time in Palau

Palau: Dealing with construction permits: Time was 90 days in 2019. ▬ Flat

Latest (2019)
90 days
Change on year
unchanged
World rank
154th
of 185 countries
All-time high
90 days
in 2005
All-time low
90 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Palau, 2005–2019

0204060801002005201220192005: 90 days2006: 90 days2007: 90 days2008: 90 days2009: 90 days2010: 90 days2011: 90 days2012: 90 days2013: 90 days2014: 90 days2015: 90 days2016: 90 days2017: 90 days2018: 90 days2019: 90 days

Source: World Bank. Measured in days.

Analysis

Palau recorded 90 days for dealing with construction permits: time in 2019. That is the highest value across all 15 years on record.

The figure is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Palau peaked at 90 days in 2005 and was at its lowest, 90 days, in 2005.

That places Palau 154th out of 185 countries with data for 2019, putting it in the bottom quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 90 days 90 days 90 days 5
2010s 90 days 90 days 90 days 10

Countries ranked near Palau

  1. 151 Lao PDR 92 days compare
  2. 151 St. Vincent and the Grenadines 92 days compare
  3. 153 North Macedonia 91 days compare
  4. 155 Benin 88 days compare
  5. 155 Myanmar 88 days compare
  6. 157 Qatar 87.5 days compare

See the full ranking of 187 places →

More private sector data for Palau

All data for Palau →

Frequently asked questions

What is dealing with construction permits: time in Palau?
Dealing with construction permits: time in Palau was 90 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Palau?
The highest recorded value was 90 days in 2005.
What is the lowest dealing with construction permits: time recorded in Palau?
The lowest recorded value was 90 days in 2005.
How does Palau rank for dealing with construction permits: time?
Palau ranks 154th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Palau?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Palau data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.