Dealing with construction permits: Time in Palau
Palau: Dealing with construction permits: Time was 90 days in 2019. ▬ Flat
Dealing with construction permits: Time in Palau, 2005–2019
Source: World Bank. Measured in days.
Analysis
Palau recorded 90 days for dealing with construction permits: time in 2019. That is the highest value across all 15 years on record.
The figure is unchanged over ten years.
Over the whole period, dealing with construction permits: time in Palau peaked at 90 days in 2005 and was at its lowest, 90 days, in 2005.
That places Palau 154th out of 185 countries with data for 2019, putting it in the bottom quarter.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 90 days | 90 days | 90 days | 5 |
| 2010s | 90 days | 90 days | 90 days | 10 |
Countries ranked near Palau
More private sector data for Palau
- Merchandise trade 47.8% (2025)
- Food imports 23.0% (2018)
- Manufactures imports 50.8% (2018)
- Merchandise imports 162.00 million current US$ (2025)
- Food exports 88.7% (2018)
- Manufactures exports 9.0% (2018)
- Merchandise exports 3.00 million current US$ (2025)
- Commercial service exports 55.85 million current US$ (2023)
- Transport services 58.2% (2023)
- Computer, communications and other services 13.1% (2023)
Frequently asked questions
- What is dealing with construction permits: time in Palau?
- Dealing with construction permits: time in Palau was 90 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Palau?
- The highest recorded value was 90 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Palau?
- The lowest recorded value was 90 days in 2005.
- How does Palau rank for dealing with construction permits: time?
- Palau ranks 154th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Palau?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Palau data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.