Palau vs Qatar: Dealing with construction permits: Time (days) (Time days)

Palau
90 days
in 2019
Qatar
87.5 days
in 2019
Palau rank
157th
Qatar rank
160th

Dealing with construction permits: Time (days) (Time days) over time

  • Palau
  • Qatar
020406080100200520122019

How they compare

Palau currently reports 90 days against 87.5 days in Qatar, a difference of 2.5 days.

Across all 13 years both countries report, Palau has been ahead every year.

Palau ranks 157th and Qatar ranks 160th of 188 countries.

Palau has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Palau Qatar Difference Ahead
2000s 90 days 62 days 28 days Palau
2010s 90 days 74.75 days 15.25 days Palau

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Palau or Qatar?
Palau, at 90 days against 87.5 days in Qatar as of 2019.
What is the difference in dealing with construction permits: time between Palau and Qatar?
2.5 days, with Palau ahead.
How many years of comparable data are there for Palau and Qatar?
13 years are reported by both, from 2007 to 2019.
How do Palau and Qatar rank globally for dealing with construction permits: time?
Palau ranks 157th and Qatar ranks 160th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Palau vs Qatar: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/palau/qatar/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/palau/qatar/">Palau vs Qatar: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.