Palau vs Saint Vincent and the Grenadines: Dealing with construction permits: Time

Palau
90 days
in 2019
Saint Vincent and the Grenadines
92 days
in 2019
Palau rank
156th
Saint Vincent and the Grenadines rank
153rd

Dealing with construction permits: Time over time

  • Palau
  • Saint Vincent and the Grenadines
020406080100200520122019

How they compare

Saint Vincent and the Grenadines currently reports 92 days against 90 days in Palau, a difference of 2 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Palau ahead.

Palau ranks 156th and Saint Vincent and the Grenadines ranks 153rd of 187 countries.

Palau has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Palau Saint Vincent and the Grenadines Difference Ahead
2000s 90 days 82 days 8 days Palau
2010s 90 days 89.9 days 0.1 days Palau

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Palau or Saint Vincent and the Grenadines?
Saint Vincent and the Grenadines, at 92 days against 90 days in Palau as of 2019.
What is the difference in dealing with construction permits: time between Palau and Saint Vincent and the Grenadines?
2 days, with Saint Vincent and the Grenadines ahead.
How many years of comparable data are there for Palau and Saint Vincent and the Grenadines?
15 years are reported by both, from 2005 to 2019.
How do Palau and Saint Vincent and the Grenadines rank globally for dealing with construction permits: time?
Palau ranks 156th and Saint Vincent and the Grenadines ranks 153rd of 187 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Palau vs Saint Vincent and the Grenadines: Dealing with construction permits: Time. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/palau/st-vincent-and-the-grenadines/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/palau/st-vincent-and-the-grenadines/">Palau vs Saint Vincent and the Grenadines: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.