Palau vs Saint Vincent and the Grenadines: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Palau
- Saint Vincent and the Grenadines
How they compare
Saint Vincent and the Grenadines currently reports 92 days against 90 days in Palau, a difference of 2 days.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Palau ahead.
Palau ranks 156th and Saint Vincent and the Grenadines ranks 153rd of 187 countries.
Palau has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Palau | Saint Vincent and the Grenadines | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 90 days | 82 days | 8 days | Palau |
| 2010s | 90 days | 89.9 days | 0.1 days | Palau |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Palau or Saint Vincent and the Grenadines?
- Saint Vincent and the Grenadines, at 92 days against 90 days in Palau as of 2019.
- What is the difference in dealing with construction permits: time between Palau and Saint Vincent and the Grenadines?
- 2 days, with Saint Vincent and the Grenadines ahead.
- How many years of comparable data are there for Palau and Saint Vincent and the Grenadines?
- 15 years are reported by both, from 2005 to 2019.
- How do Palau and Saint Vincent and the Grenadines rank globally for dealing with construction permits: time?
- Palau ranks 156th and Saint Vincent and the Grenadines ranks 153rd of 187 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.