Panama vs St. Kitts and Nevis: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Panama
- St. Kitts and Nevis
How they compare
Panama currently reports 105 days against 105 days in St. Kitts and Nevis, a difference of 0 days.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Panama ahead.
Panama ranks 132nd and St. Kitts and Nevis ranks 132nd of 187 countries.
Panama has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Panama | St. Kitts and Nevis | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 141.2 days | 105 days | 36.2 days | Panama |
| 2010s | 107.8 days | 105 days | 2.8 days | Panama |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Panama or St. Kitts and Nevis?
- Panama, at 105 days against 105 days in St. Kitts and Nevis as of 2019.
- What is the difference in dealing with construction permits: time between Panama and St. Kitts and Nevis?
- 0 days, with Panama ahead.
- How many years of comparable data are there for Panama and St. Kitts and Nevis?
- 15 years are reported by both, from 2005 to 2019.
- How do Panama and St. Kitts and Nevis rank globally for dealing with construction permits: time?
- Panama ranks 132nd and St. Kitts and Nevis ranks 132nd of 187 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.