Papua New Guinea vs Suriname: Dealing with construction permits: Time

Papua New Guinea
217 days
in 2019
Suriname
223 days
in 2019
Papua New Guinea rank
30th
Suriname rank
27th

Dealing with construction permits: Time over time

  • Papua New Guinea
  • Suriname
0100200300200520122019

How they compare

Suriname currently reports 223 days against 217 days in Papua New Guinea, a difference of 6 days.

Across all 15 years both countries report, Suriname has been ahead every year.

Papua New Guinea ranks 30th and Suriname ranks 27th of 187 countries.

Suriname has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Papua New Guinea Suriname Difference Ahead
2000s 217 days 253 days 36 days Suriname
2010s 217 days 232 days 15 days Suriname

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Papua New Guinea or Suriname?
Suriname, at 223 days against 217 days in Papua New Guinea as of 2019.
What is the difference in dealing with construction permits: time between Papua New Guinea and Suriname?
6 days, with Suriname ahead.
How many years of comparable data are there for Papua New Guinea and Suriname?
15 years are reported by both, from 2005 to 2019.
How do Papua New Guinea and Suriname rank globally for dealing with construction permits: time?
Papua New Guinea ranks 30th and Suriname ranks 27th of 187 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Papua New Guinea vs Suriname: Dealing with construction permits: Time. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/papua-new-guinea/suriname/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/papua-new-guinea/suriname/">Papua New Guinea vs Suriname: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.