Qatar vs Sri Lanka: Dealing with construction permits: Time (days) (Time days)

Qatar
87.5 days
in 2019
Sri Lanka
86 days
in 2019
Qatar rank
160th
Sri Lanka rank
163rd

Dealing with construction permits: Time (days) (Time days) over time

  • Qatar
  • Sri Lanka
050100150200200520122019

How they compare

Qatar currently reports 87.5 days against 86 days in Sri Lanka, a difference of 1.5 days.

The two have swapped places 1 time across 13 shared years of data; in 2007 it was Sri Lanka ahead.

Qatar ranks 160th and Sri Lanka ranks 163rd of 188 countries.

Sri Lanka has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Qatar Sri Lanka Difference Ahead
2000s 62 days 176.33 days 114.33 days Sri Lanka
2010s 74.75 days 138.3 days 63.55 days Sri Lanka

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Qatar or Sri Lanka?
Qatar, at 87.5 days against 86 days in Sri Lanka as of 2019.
What is the difference in dealing with construction permits: time between Qatar and Sri Lanka?
1.5 days, with Qatar ahead.
How many years of comparable data are there for Qatar and Sri Lanka?
13 years are reported by both, from 2007 to 2019.
How do Qatar and Sri Lanka rank globally for dealing with construction permits: time?
Qatar ranks 160th and Sri Lanka ranks 163rd of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Qatar vs Sri Lanka: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/qatar/sri-lanka/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/qatar/sri-lanka/">Qatar vs Sri Lanka: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.