Qatar vs Syrian Arab Republic: Dealing with construction permits: Time

Qatar
87.5 days
in 2019
Syrian Arab Republic
87 days
in 2012
Qatar rank
157th
Syrian Arab Republic rank
158th

Dealing with construction permits: Time over time

  • Qatar
  • Syrian Arab Republic
020406080200520122019

How they compare

Qatar currently reports 87.5 days against 87 days in Syrian Arab Republic, a difference of 0.5 days.

Across all 6 years both countries report, Syrian Arab Republic has been ahead every year.

Qatar ranks 157th and Syrian Arab Republic ranks 158th of 185 countries.

Syrian Arab Republic has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Qatar Syrian Arab Republic Difference Ahead
2000s 62 days 87 days 25 days Syrian Arab Republic
2010s 62 days 87 days 25 days Syrian Arab Republic

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Qatar or Syrian Arab Republic?
Qatar, at 87.5 days against 87 days in Syrian Arab Republic as of 2019.
What is the difference in dealing with construction permits: time between Qatar and Syrian Arab Republic?
0.5 days, with Qatar ahead.
How many years of comparable data are there for Qatar and Syrian Arab Republic?
6 years are reported by both, from 2007 to 2012.
How do Qatar and Syrian Arab Republic rank globally for dealing with construction permits: time?
Qatar ranks 157th and Syrian Arab Republic ranks 158th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.