Qatar vs Syrian Arab Republic: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Qatar
- Syrian Arab Republic
How they compare
Qatar currently reports 87.5 days against 87 days in Syrian Arab Republic, a difference of 0.5 days.
Across all 6 years both countries report, Syrian Arab Republic has been ahead every year.
Qatar ranks 157th and Syrian Arab Republic ranks 158th of 185 countries.
Syrian Arab Republic has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Qatar | Syrian Arab Republic | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 62 days | 87 days | 25 days | Syrian Arab Republic |
| 2010s | 62 days | 87 days | 25 days | Syrian Arab Republic |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Qatar or Syrian Arab Republic?
- Qatar, at 87.5 days against 87 days in Syrian Arab Republic as of 2019.
- What is the difference in dealing with construction permits: time between Qatar and Syrian Arab Republic?
- 0.5 days, with Qatar ahead.
- How many years of comparable data are there for Qatar and Syrian Arab Republic?
- 6 years are reported by both, from 2007 to 2012.
- How do Qatar and Syrian Arab Republic rank globally for dealing with construction permits: time?
- Qatar ranks 157th and Syrian Arab Republic ranks 158th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.