Romania vs Sudan: Dealing with construction permits: Time

Romania
260 days
in 2019
Sudan
255 days
in 2019
Romania rank
15th
Sudan rank
16th

Dealing with construction permits: Time over time

  • Romania
  • Sudan
0100200300200520122019

How they compare

Romania currently reports 260 days against 255 days in Sudan, a difference of 5 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Sudan ahead.

Romania ranks 15th and Sudan ranks 16th of 185 countries.

Sudan has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Romania Sudan Difference Ahead
2000s 193.6 days 274 days 80.4 days Sudan
2010s 233.4 days 255 days 21.6 days Sudan

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Romania or Sudan?
Romania, at 260 days against 255 days in Sudan as of 2019.
What is the difference in dealing with construction permits: time between Romania and Sudan?
5 days, with Romania ahead.
How many years of comparable data are there for Romania and Sudan?
15 years are reported by both, from 2005 to 2019.
How do Romania and Sudan rank globally for dealing with construction permits: time?
Romania ranks 15th and Sudan ranks 16th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.