Dealing with construction permits: Time (days) (Time days) in Romania

Romania: Dealing with construction permits: Time was 260 days in 2019. ▲ Rising

Latest (2019)
260 days
Change on year
unchanged
World rank
15th
of 188 countries
All-time high
260 days
in 2015
All-time low
193 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Romania, 2005–2019

01002003002005201220192005: 193 days2006: 193 days2007: 194 days2008: 194 days2009: 194 days2010: 206 days2011: 207 days2012: 207 days2013: 207 days2014: 207 days2015: 260 days2016: 260 days2017: 260 days2018: 260 days2019: 260 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Romania is 260 days, measured in 2019. That is the highest value across all 15 years on record.

That represents a change of up 34.0% over ten years.

Over the whole period, dealing with construction permits: time in Romania peaked at 260 days in 2015 and was at its lowest, 193 days, in 2005.

Romania ranks 15th of 188 countries on this measure, in the top 10%.

The long-run direction has been consistently rising across the 15 years of available data.

Dealing with construction permits: Time in Romania, year by year

Annual values for Dealing with construction permits: Time (days) in Romania, 2005 to 2019.
Year days Change
2005 193 days —
2006 193 days +0.0%
2007 194 days +0.5%
2008 194 days +0.0%
2009 194 days +0.0%
2010 206 days +6.2%
2011 207 days +0.5%
2012 207 days +0.0%
2013 207 days +0.0%
2014 207 days +0.0%
2015 260 days +25.6%
2016 260 days +0.0%
2017 260 days +0.0%
2018 260 days +0.0%
2019 260 days +0.0%

Romania compared with similar countries

  • Romania's 260 days is above the median for high income countries, which is 144.75 days, 1.8× the median. (62 countries reporting)
  • Romania's 260 days is above the median for Europe & Central Asia, which is 156 days, 1.7× the median. (49 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 193.6 days 193 days 194 days 5
2010s 233.4 days 206 days 260 days 10

Countries ranked near Romania

  1. 12 Gabon 275 days compare
  2. 13 Bangladesh 273.52 days compare
  3. 14 Uruguay 265 days compare
  4. 16 Sudan 255 days compare
  5. 17 Trinidad and Tobago 254 days compare
  6. 18 Canada 249 days compare

See the full ranking of 188 places →

More private sector data for Romania

All data for Romania →

Frequently asked questions

What is dealing with construction permits: time in Romania?
Dealing with construction permits: time in Romania was 260 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Romania?
The highest recorded value was 260 days in 2015.
What is the lowest dealing with construction permits: time recorded in Romania?
The lowest recorded value was 193 days in 2005.
How does Romania rank for dealing with construction permits: time?
Romania ranks 15th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Romania?
Over the last ten years it is up 34.0%. The long-run trend across the full record is rising.
Where does this Romania data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Romania. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/romania/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/romania/">Dealing with construction permits: Time in Romania</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.