Dealing with construction permits: Time in Sudan

Sudan: Dealing with construction permits: Time was 255 days in 2019. ▼ Falling

Latest (2019)
255 days
Change on year
unchanged
World rank
16th
of 185 countries
All-time high
285 days
in 2005
All-time low
255 days
in 2009
Years of data
15
2005–2019

Dealing with construction permits: Time in Sudan, 2005–2019

01002003002005201220192005: 285 days2006: 285 days2007: 285 days2008: 260 days2009: 255 days2010: 255 days2011: 255 days2012: 255 days2013: 255 days2014: 255 days2015: 255 days2016: 255 days2017: 255 days2018: 255 days2019: 255 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Sudan stood at 255 days. That is the lowest value across all 15 years on record.

The figure is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Sudan peaked at 285 days in 2005 and was at its lowest, 255 days, in 2009.

That places Sudan 16th out of 185 countries with data for 2019, putting it in the top 10%.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 274 days 255 days 285 days 5
2010s 255 days 255 days 255 days 10

Countries ranked near Sudan

  1. 13 Bangladesh 273.52 days compare
  2. 14 Uruguay 265 days compare
  3. 15 Romania 260 days compare
  4. 17 Trinidad and Tobago 254 days compare
  5. 18 Canada 249 days compare
  6. 19 Slovenia 247.5 days compare

See the full ranking of 187 places →

More private sector data for Sudan

All data for Sudan →

Frequently asked questions

What is dealing with construction permits: time in Sudan?
Dealing with construction permits: time in Sudan was 255 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Sudan?
The highest recorded value was 285 days in 2005.
What is the lowest dealing with construction permits: time recorded in Sudan?
The lowest recorded value was 255 days in 2009.
How does Sudan rank for dealing with construction permits: time?
Sudan ranks 16th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Sudan?
Over the last ten years it is unchanged. The long-run trend across the full record is falling.
Where does this Sudan data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.