Romania vs Trinidad and Tobago: Dealing with construction permits: Time

Romania
260 days
in 2019
Trinidad and Tobago
254 days
in 2019
Romania rank
15th
Trinidad and Tobago rank
17th

Dealing with construction permits: Time over time

  • Romania
  • Trinidad and Tobago
0100200300200520122019

How they compare

Romania currently reports 260 days against 254 days in Trinidad and Tobago, a difference of 6 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Trinidad and Tobago ahead.

Romania ranks 15th and Trinidad and Tobago ranks 17th of 187 countries.

Trinidad and Tobago has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Romania Trinidad and Tobago Difference Ahead
2000s 193.6 days 254 days 60.4 days Trinidad and Tobago
2010s 233.4 days 254 days 20.6 days Trinidad and Tobago

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Romania or Trinidad and Tobago?
Romania, at 260 days against 254 days in Trinidad and Tobago as of 2019.
What is the difference in dealing with construction permits: time between Romania and Trinidad and Tobago?
6 days, with Romania ahead.
How many years of comparable data are there for Romania and Trinidad and Tobago?
15 years are reported by both, from 2005 to 2019.
How do Romania and Trinidad and Tobago rank globally for dealing with construction permits: time?
Romania ranks 15th and Trinidad and Tobago ranks 17th of 187 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Romania vs Trinidad and Tobago: Dealing with construction permits: Time. Statizoid. Retrieved 18 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/romania/trinidad-and-tobago/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/romania/trinidad-and-tobago/">Romania vs Trinidad and Tobago: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.