San Marino vs Spain: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- San Marino
- Spain
How they compare
Spain currently reports 147 days against 145.5 days in San Marino, a difference of 1.5 days.
The two have swapped places 2 times across 8 shared years of data; in 2012 it was Spain ahead.
San Marino ranks 84th and Spain ranks 81st of 185 countries.
San Marino has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: time, San Marino or Spain?
- Spain, at 147 days against 145.5 days in San Marino as of 2019.
- What is the difference in dealing with construction permits: time between San Marino and Spain?
- 1.5 days, with Spain ahead.
- How many years of comparable data are there for San Marino and Spain?
- 8 years are reported by both, from 2012 to 2019.
- How do San Marino and Spain rank globally for dealing with construction permits: time?
- San Marino ranks 84th and Spain ranks 81st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.