San Marino vs Spain: Dealing with construction permits: Time

San Marino
145.5 days
in 2019
Spain
147 days
in 2019
San Marino rank
84th
Spain rank
81st

Dealing with construction permits: Time over time

  • San Marino
  • Spain
050100150200200520122019

How they compare

Spain currently reports 147 days against 145.5 days in San Marino, a difference of 1.5 days.

The two have swapped places 2 times across 8 shared years of data; in 2012 it was Spain ahead.

San Marino ranks 84th and Spain ranks 81st of 185 countries.

San Marino has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: time, San Marino or Spain?
Spain, at 147 days against 145.5 days in San Marino as of 2019.
What is the difference in dealing with construction permits: time between San Marino and Spain?
1.5 days, with Spain ahead.
How many years of comparable data are there for San Marino and Spain?
8 years are reported by both, from 2012 to 2019.
How do San Marino and Spain rank globally for dealing with construction permits: time?
San Marino ranks 84th and Spain ranks 81st of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.