Senegal vs Zimbabwe: Dealing with construction permits: Time

Senegal
177 days
in 2019
Zimbabwe
178 days
in 2019
Senegal rank
56th
Zimbabwe rank
55th

Dealing with construction permits: Time over time

  • Senegal
  • Zimbabwe
200300400500600200520122019

How they compare

Zimbabwe currently reports 178 days against 177 days in Senegal, a difference of 1 days.

Across all 15 years both countries report, Zimbabwe has been ahead every year.

Senegal ranks 56th and Zimbabwe ranks 55th of 185 countries.

Zimbabwe has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Senegal Zimbabwe Difference Ahead
2000s 252 days 421.4 days 169.4 days Zimbabwe
2010s 217.5 days 390.4 days 172.9 days Zimbabwe

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Senegal or Zimbabwe?
Zimbabwe, at 178 days against 177 days in Senegal as of 2019.
What is the difference in dealing with construction permits: time between Senegal and Zimbabwe?
1 days, with Zimbabwe ahead.
How many years of comparable data are there for Senegal and Zimbabwe?
15 years are reported by both, from 2005 to 2019.
How do Senegal and Zimbabwe rank globally for dealing with construction permits: time?
Senegal ranks 56th and Zimbabwe ranks 55th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.