Serbia vs Solomon Islands: Dealing with construction permits: Time

Serbia
99.5 days
in 2019
Solomon Islands
99 days
in 2019
Serbia rank
142nd
Solomon Islands rank
143rd

Dealing with construction permits: Time over time

  • Serbia
  • Solomon Islands
100150200250300350200520122019

How they compare

Serbia currently reports 99.5 days against 99 days in Solomon Islands, a difference of 0.5 days.

Across all 15 years both countries report, Serbia has been ahead every year.

Serbia ranks 142nd and Solomon Islands ranks 143rd of 185 countries.

Serbia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Serbia Solomon Islands Difference Ahead
2000s 294.2 days 99 days 195.2 days Serbia
2010s 238.85 days 99 days 139.85 days Serbia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Serbia or Solomon Islands?
Serbia, at 99.5 days against 99 days in Solomon Islands as of 2019.
What is the difference in dealing with construction permits: time between Serbia and Solomon Islands?
0.5 days, with Serbia ahead.
How many years of comparable data are there for Serbia and Solomon Islands?
15 years are reported by both, from 2005 to 2019.
How do Serbia and Solomon Islands rank globally for dealing with construction permits: time?
Serbia ranks 142nd and Solomon Islands ranks 143rd of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.