Seychelles vs Saint Lucia: Dealing with construction permits: Time

Seychelles
113 days
in 2019
Saint Lucia
116 days
in 2019
Seychelles rank
121st
Saint Lucia rank
118th

Dealing with construction permits: Time over time

  • Seychelles
  • Saint Lucia
050100150200520122019

How they compare

Saint Lucia currently reports 116 days against 113 days in Seychelles, a difference of 3 days.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Saint Lucia ahead.

Seychelles ranks 121st and Saint Lucia ranks 118th of 185 countries.

Seychelles has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Seychelles Saint Lucia Difference Ahead
2000s 138 days 135.8 days 2.2 days Seychelles
2010s 135.5 days 116 days 19.5 days Seychelles

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Seychelles or Saint Lucia?
Saint Lucia, at 116 days against 113 days in Seychelles as of 2019.
What is the difference in dealing with construction permits: time between Seychelles and Saint Lucia?
3 days, with Saint Lucia ahead.
How many years of comparable data are there for Seychelles and Saint Lucia?
15 years are reported by both, from 2005 to 2019.
How do Seychelles and Saint Lucia rank globally for dealing with construction permits: time?
Seychelles ranks 121st and Saint Lucia ranks 118th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.