Dealing with construction permits: Time in Seychelles

Seychelles: Dealing with construction permits: Time was 113 days in 2019. ▼ Falling

Latest (2019)
113 days
Change on year
down 18.1%
World rank
121st
of 185 countries
All-time high
138 days
in 2005
All-time low
113 days
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Time in Seychelles, 2005–2019

0501001502005201220192005: 138 days2006: 138 days2007: 138 days2008: 138 days2009: 138 days2010: 138 days2011: 138 days2012: 138 days2013: 138 days2014: 138 days2015: 138 days2016: 138 days2017: 138 days2018: 138 days2019: 113 days

Source: World Bank. Measured in days.

Analysis

Seychelles recorded 113 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

That represents a change of down 18.1% on the previous year and down 18.1% over ten years.

Over the whole period, dealing with construction permits: time in Seychelles peaked at 138 days in 2005 and was at its lowest, 113 days, in 2019.

That places Seychelles 121st out of 185 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 138 days 138 days 138 days 5
2010s 135.5 days 113 days 138 days 10

Countries ranked near Seychelles

  1. 118 Azerbaijan 116 days compare
  2. 118 Eswatini 116 days compare
  3. 118 St. Lucia 116 days compare
  4. 121 Thailand 113 days compare
  5. 121 Uganda 113 days compare
  6. 124 China 110.88 days compare

See the full ranking of 187 places →

More private sector data for Seychelles

All data for Seychelles →

Frequently asked questions

What is dealing with construction permits: time in Seychelles?
Dealing with construction permits: time in Seychelles was 113 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Seychelles?
The highest recorded value was 138 days in 2005.
What is the lowest dealing with construction permits: time recorded in Seychelles?
The lowest recorded value was 113 days in 2019.
How does Seychelles rank for dealing with construction permits: time?
Seychelles ranks 121st out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Seychelles?
Over the last ten years it is down 18.1%. The long-run trend across the full record is falling.
Where does this Seychelles data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.