Seychelles vs Uganda: Dealing with construction permits: Time (days) (Time days)

Seychelles
113 days
in 2019
Uganda
113 days
in 2019
Seychelles rank
124th
Uganda rank
124th

Dealing with construction permits: Time (days) (Time days) over time

  • Seychelles
  • Uganda
050100150200520122019

How they compare

Seychelles currently reports 113 days against 113 days in Uganda, a difference of 0 days.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Uganda ahead.

Seychelles ranks 124th and Uganda ranks 124th of 188 countries.

Across the 2 decades both report, Seychelles averaged higher in 1 and Uganda in 1.

Head to head by decade

Decade Seychelles Uganda Difference Ahead
2000s 138 days 145 days 7 days Uganda
2010s 135.5 days 130.7 days 4.8 days Seychelles

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Seychelles or Uganda?
Seychelles, at 113 days against 113 days in Uganda as of 2019.
What is the difference in dealing with construction permits: time between Seychelles and Uganda?
0 days, with Seychelles ahead.
How many years of comparable data are there for Seychelles and Uganda?
15 years are reported by both, from 2005 to 2019.
How do Seychelles and Uganda rank globally for dealing with construction permits: time?
Seychelles ranks 124th and Uganda ranks 124th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Seychelles vs Uganda: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/seychelles/uganda/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/seychelles/uganda/">Seychelles vs Uganda: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.