Slovenia vs Uzbekistan: Dealing with construction permits: Time

Slovenia
247.5 days
in 2019
Uzbekistan
246 days
in 2019
Slovenia rank
19th
Uzbekistan rank
20th

Dealing with construction permits: Time over time

  • Slovenia
  • Uzbekistan
0100200300200520122019

How they compare

Slovenia currently reports 247.5 days against 246 days in Uzbekistan, a difference of 1.5 days.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Slovenia ahead.

Slovenia ranks 19th and Uzbekistan ranks 20th of 187 countries.

Slovenia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Slovenia Uzbekistan Difference Ahead
2000s 292.8 days 261 days 31.8 days Slovenia
2010s 256.5 days 255.3 days 1.2 days Slovenia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Slovenia or Uzbekistan?
Slovenia, at 247.5 days against 246 days in Uzbekistan as of 2019.
What is the difference in dealing with construction permits: time between Slovenia and Uzbekistan?
1.5 days, with Slovenia ahead.
How many years of comparable data are there for Slovenia and Uzbekistan?
15 years are reported by both, from 2005 to 2019.
How do Slovenia and Uzbekistan rank globally for dealing with construction permits: time?
Slovenia ranks 19th and Uzbekistan ranks 20th of 187 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Slovenia vs Uzbekistan: Dealing with construction permits: Time. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/slovenia/uzbekistan/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/slovenia/uzbekistan/">Slovenia vs Uzbekistan: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.